Tag - fukushima-no-2

 
 

FUKUSHIMA NO 2

JAPAN
Aug 29, 2014
Heavy control console falls back into Fukushima fuel pool: Tepco
Tokyo Electric Power Co. said it's detected no change in radiation levels in the No. 3 reactor building of the Fukushima No. 1 power plant after a 400-kg piece of equipment slipped from a crane and fell back into a pool holding spent uranium fuel rods.
Japan Times
JAPAN
Aug 25, 2014
After leaks, government to release interviews with deceased Fukushima plant boss
After months of leaks, criticism and controversy, the government says it will release most of the transcribed testimony of the late Masao Yoshida, who dealt with the 2011 triple meltdown crisis as head of the Fukushima No. 1 nuclear plant.
COMMENTARY / Japan
Aug 25, 2014
The unsung heroes of Fukushima
What really went on among the workers inside the Fukushima No. 2 nuclear power plant after the 2011 earthquake and tsunami should be held up as an epic story with the theme of 'Man Saved in Japan.'
BASKETBALL / BJ-LEAGUE NOTEBOOK
Aug 21, 2014
Grouses remain in transition as preseason looms
Less than two weeks before the league's preseason schedule tips off, the Toyama Grouses roster doesn't resemble the one that soared to great heights last season.
Japan Times
WORLD / ANALYSIS
Aug 18, 2014
Europe struggles with cost of caring for its elderly nuclear plants
Europe's aging nuclear plants will undergo more prolonged outages over the next few years, reducing the reliability of power supply and costing operators many billions of dollars.
Japan Times
JAPAN / Science & Health
Aug 17, 2014
Scientist weighs homecoming risks in Fukushima
When scientist Junko Nakanishi stepped into radiation-contaminated towns and villages in Fukushima Prefecture 10 months after the nuclear power plant meltdowns of 2011, she realized how difficult the job of decontamination would be.
JAPAN / FUKUSHIMA FILE
Aug 17, 2014
First tranche of public housing for Fukushima evacuees hit by delays
About 40 percent of the first batch of public housing for people displaced by the Fukushima nuclear disaster will not be ready by the end of fiscal 2015, forcing those who evacuated to wait longer for permanent abodes.

Longform

Construction takes place on the Takanawa Gateway Convention Center in Tokyo, slated to open in 2025.
A boom for business tourism in Japan?